Soft soil engineeringBujeon ~ Masan Railway |
Category |
BTL (First proposal) |
Client |
Ministry of Land, Infrastructure and Transport |
Contractor |
Posco E & C |
Period |
April 09, 2010 ~ July 31, 2010 |
|
|
|
|
|
|
|
|
Project Information |
|
-
Description
-
Earthworks L = 6.8km
-
Bridge L = 4.18km
-
Tunnel L = 21.11km
-
Technical Issues
-
Application of ground improvement methods according to depth of soft soil layer; pre-loading method (D<3m), pre-loading and GCP method (D>3m)
-
Application of a rahmen structure and pile foundation methods for the section that is expected to exceed the allowable residual settlement
-
Optimum spacing design of vertical drains based on analysis of the time-consolidation curve
|
|