Samdo-dong ~ Dado-myeon, Naju – si, Jeollanam-do
-
Description
-
Total L = 17,994m(Down line based)
-
2 Tunnel (Gakdong-Tunnel L = 4,455m, Masan-Tunnel L = 360m)
-
1 Inclined Tunnel, L = 405m
-
Technical Issue
- Installation of invert throughout the tunnel to prevent the bottom of the tunnel from rising
- Establishing the shortest inclined tunnel installation plan to minimize evacuation distance
- Establishment of comprehensive disaster prevention system plan including Safety Zone to improve disaster prevention performance
- Formulation of reinforcement retaining wall application plan to minimize environmental damage and ensure slope stability
|