PROJECTRailway tunnels

Railway tunnels

Railway tunnelsChungbuk Railway High Speed project(C4)
Category T/K basic design
Client Korea National Railway
Contractor Daebo Construction Co., Ltd.
Period November 25, 2024 ~ June 24, 2025
Project Information

 

  • Location

   Myeongseo-ri, Sancheok-myeon, Chungju-si to Jangpyeong-ri, Bongyang-eup, Jecheon-si, Chungcheongbuk-do, Korea 

 

  • Descripton
    • Total Length : 12,868.75 m
    • Tunnel Length : 8,290m(Cheondeung Tunnel)
    • 2 Inclined Tunnel (#1 : 272 m, #2 : 185 m)

     

 
      • Technical Issue
        • Design of tunnel cross-section considering train safety and tunnel maintenance
        • Design of tunnel reinforcement considering the geology of Mt. Cheondeungsan and the hydraulic impact of the Jecheoncheon River
        • Design of a rapid-responsed disaster prevention infrastructure and high-speed smoke exhaust system
        • Design of tunnel portal that harmonizes with natural topography considering environment preservation