Myeongseo-ri, Sancheok-myeon, Chungju-si to Jangpyeong-ri, Bongyang-eup, Jecheon-si, Chungcheongbuk-do, Korea
-
Descripton
-
Total Length : 12,868.75 m
-
Tunnel Length : 8,290m(Cheondeung Tunnel)
-
2 Inclined Tunnel (#1 : 272 m, #2 : 185 m)
-
Technical Issue
-
Design of tunnel cross-section considering train safety and tunnel maintenance
-
Design of tunnel reinforcement considering the geology of Mt. Cheondeungsan and the hydraulic impact of the Jecheoncheon River
-
Design of a rapid-responsed disaster prevention infrastructure and high-speed smoke exhaust system
-
Design of tunnel portal that harmonizes with natural topography considering environment preservation
|